Düren Public Utilities, January 2007

Situation On-Site

Rehabilitation of a pump pressure pipe over a total length of 1,215 m to Hemgenberg

Laying of Primus Line®
in an existing pipe:

Primus Line® DN 500 PN 16

Installation:

3 installation sections

Longest installation section:

550 metres