Düren Public Utilities, January 2007
Situation On-Site | Rehabilitation of a pump pressure pipe over a total length of 1,215 m to Hemgenberg |
Laying of Primus Line® | Primus Line® DN 500 PN 16 |
Installation: | 3 installation sections |
Longest installation section: | 550 metres |




raedlinger.com